Construction

Actual construction updates

  • 1ST Quater
  • 2ND Quater
  • 3RD Quater
  • 4TH Quater
  • 3 BHK - 1550 sq.ft
  • 3+1 BHK - 2250 sq.ft
  • 2 BHK - 1305 sq.ft
  • 3 BHK - 2050 sq.ft

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
i j k
1. Excavation 10% 10% 10%
2. Foundations or basement 10% 10% 10%
3. Completion of all slabs 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10%
14. Wiring and switches. 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10%
16. False ceiling work. 10% 10% 10%
17. Polishing or painting work. 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10%
22. Installation of lifts. 10% 10% 10%
23. Electrical panels. 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
i j k
1. Podium for parking. 10% 10% 10%
2. External public health work. 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10%
4. External fire fighting work. 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10%
8. External roads. 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10%
10. External electrical work including substation. 10% 10% 10%
11. Bore well for water supply. 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10%
15. Club house. 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
l m n o
1. Excavation 10% 10% 10% 10%
2. Foundations or basement 10% 10% 10% 10%
3. Completion of all slabs 10% 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10% 10%
14. Wiring and switches. 10% 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10% 10%
16. False ceiling work. 10% 10% 10% 10%
17. Polishing or painting work. 10% 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10% 10%
22. Installation of lifts. 10% 10% 10% 10%
23. Electrical panels. 10% 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
l m n o
1. Podium for parking. 10% 10% 10% 10%
2. External public health work. 10% 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10% 10%
4. External fire fighting work. 10% 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10% 10%
8. External roads. 10% 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10% 10%
10. External electrical work including substation. 10% 10% 10% 10%
11. Bore well for water supply. 10% 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10% 10%
15. Club house. 10% 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
p q
1. Excavation 10% 10%
2. Foundations or basement 10% 10%
3. Completion of all slabs 10% 10%
4. Internal walls and plaster work 10% 10%
5. Fixing of chowkhats 10% 10%
6. Internal electrical work upto conducting 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10%
8. Internal Fire fighting work 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10%
10. Internal finishing like putty or paints etc. 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10%
12. External finishing like putty or paints etc. 10% 10%
13. External doors and windows including hardware. 10% 10%
14. Wiring and switches. 10% 10%
15. Internal doors and windows including hardware. 10% 10%
16. False ceiling work. 10% 10%
17. Polishing or painting work. 10% 10%
18. Cabling work in the towers. 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10%
20. Taps, wash basin, seat etc. 10% 10%
21. Finishing of stilt floor or basement. 10% 10%
22. Installation of lifts. 10% 10%
23. Electrical panels. 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
p q
1. Podium for parking. 10% 10%
2. External public health work. 10% 10%
3. External electrical work upto cabling work. 10% 10%
4. External fire fighting work. 10% 10%
5. Rain harvesting wells. 10% 10%
6. Sewerage Treatment plant. 10% 10%
7. Land scaping, tree planting etc. 10% 10%
8. External roads. 10% 10%
9. Treatment of wet garbage. 10% 10%
10. External electrical work including substation. 10% 10%
11. Bore well for water supply. 10% 10%
12. Under ground water tank (UGWT). 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10%
14. Fire protection and fire safety. 10% 10%
15. Club house. 10% 10%
16. Facilities and amenities other than in the club house. 10% 10%
17. Street lightning and other light work. 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
r s t
1. Excavation 10% 10% 10%
2. Foundations or basement 10% 10% 10%
3. Completion of all slabs 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10%
14. Wiring and switches. 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10%
16. False ceiling work. 10% 10% 10%
17. Polishing or painting work. 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10%
22. Installation of lifts. 10% 10% 10%
23. Electrical panels. 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
r s t
1. Podium for parking. 10% 10% 10%
2. External public health work. 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10%
4. External fire fighting work. 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10%
8. External roads. 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10%
10. External electrical work including substation. 10% 10% 10%
11. Bore well for water supply. 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10%
15. Club house. 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10%
  • 3 BHK - 1550 sq.ft
  • 3+1 BHK - 2250 sq.ft
  • 2 BHK - 1305 sq.ft
  • 3 BHK - 2050 sq.ft

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
i j k
1. Excavation 10% 10% 10%
2. Foundations or basement 10% 10% 10%
3. Completion of all slabs 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10%
14. Wiring and switches. 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10%
16. False ceiling work. 10% 10% 10%
17. Polishing or painting work. 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10%
22. Installation of lifts. 10% 10% 10%
23. Electrical panels. 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
i j k
1. Podium for parking. 10% 10% 10%
2. External public health work. 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10%
4. External fire fighting work. 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10%
8. External roads. 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10%
10. External electrical work including substation. 10% 10% 10%
11. Bore well for water supply. 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10%
15. Club house. 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
l m n o
1. Excavation 10% 10% 10% 10%
2. Foundations or basement 10% 10% 10% 10%
3. Completion of all slabs 10% 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10% 10%
14. Wiring and switches. 10% 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10% 10%
16. False ceiling work. 10% 10% 10% 10%
17. Polishing or painting work. 10% 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10% 10%
22. Installation of lifts. 10% 10% 10% 10%
23. Electrical panels. 10% 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
l m n o
1. Podium for parking. 10% 10% 10% 10%
2. External public health work. 10% 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10% 10%
4. External fire fighting work. 10% 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10% 10%
8. External roads. 10% 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10% 10%
10. External electrical work including substation. 10% 10% 10% 10%
11. Bore well for water supply. 10% 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10% 10%
15. Club house. 10% 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
p q
1. Excavation 10% 10%
2. Foundations or basement 10% 10%
3. Completion of all slabs 10% 10%
4. Internal walls and plaster work 10% 10%
5. Fixing of chowkhats 10% 10%
6. Internal electrical work upto conducting 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10%
8. Internal Fire fighting work 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10%
10. Internal finishing like putty or paints etc. 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10%
12. External finishing like putty or paints etc. 10% 10%
13. External doors and windows including hardware. 10% 10%
14. Wiring and switches. 10% 10%
15. Internal doors and windows including hardware. 10% 10%
16. False ceiling work. 10% 10%
17. Polishing or painting work. 10% 10%
18. Cabling work in the towers. 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10%
20. Taps, wash basin, seat etc. 10% 10%
21. Finishing of stilt floor or basement. 10% 10%
22. Installation of lifts. 10% 10%
23. Electrical panels. 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
p q
1. Podium for parking. 10% 10%
2. External public health work. 10% 10%
3. External electrical work upto cabling work. 10% 10%
4. External fire fighting work. 10% 10%
5. Rain harvesting wells. 10% 10%
6. Sewerage Treatment plant. 10% 10%
7. Land scaping, tree planting etc. 10% 10%
8. External roads. 10% 10%
9. Treatment of wet garbage. 10% 10%
10. External electrical work including substation. 10% 10%
11. Bore well for water supply. 10% 10%
12. Under ground water tank (UGWT). 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10%
14. Fire protection and fire safety. 10% 10%
15. Club house. 10% 10%
16. Facilities and amenities other than in the club house. 10% 10%
17. Street lightning and other light work. 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
r s t
1. Excavation 10% 10% 10%
2. Foundations or basement 10% 10% 10%
3. Completion of all slabs 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10%
14. Wiring and switches. 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10%
16. False ceiling work. 10% 10% 10%
17. Polishing or painting work. 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10%
22. Installation of lifts. 10% 10% 10%
23. Electrical panels. 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
r s t
1. Podium for parking. 10% 10% 10%
2. External public health work. 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10%
4. External fire fighting work. 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10%
8. External roads. 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10%
10. External electrical work including substation. 10% 10% 10%
11. Bore well for water supply. 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10%
15. Club house. 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10%
  • 3 BHK - 1550 sq.ft
  • 3+1 BHK - 2250 sq.ft
  • 2 BHK - 1305 sq.ft
  • 3 BHK - 2050 sq.ft

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
i j k
1. Excavation 10% 10% 10%
2. Foundations or basement 10% 10% 10%
3. Completion of all slabs 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10%
14. Wiring and switches. 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10%
16. False ceiling work. 10% 10% 10%
17. Polishing or painting work. 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10%
22. Installation of lifts. 10% 10% 10%
23. Electrical panels. 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
i j k
1. Podium for parking. 10% 10% 10%
2. External public health work. 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10%
4. External fire fighting work. 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10%
8. External roads. 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10%
10. External electrical work including substation. 10% 10% 10%
11. Bore well for water supply. 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10%
15. Club house. 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
l m n o
1. Excavation 10% 10% 10% 10%
2. Foundations or basement 10% 10% 10% 10%
3. Completion of all slabs 10% 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10% 10%
14. Wiring and switches. 10% 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10% 10%
16. False ceiling work. 10% 10% 10% 10%
17. Polishing or painting work. 10% 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10% 10%
22. Installation of lifts. 10% 10% 10% 10%
23. Electrical panels. 10% 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
l m n o
1. Podium for parking. 10% 10% 10% 10%
2. External public health work. 10% 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10% 10%
4. External fire fighting work. 10% 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10% 10%
8. External roads. 10% 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10% 10%
10. External electrical work including substation. 10% 10% 10% 10%
11. Bore well for water supply. 10% 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10% 10%
15. Club house. 10% 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
p q
1. Excavation 10% 10%
2. Foundations or basement 10% 10%
3. Completion of all slabs 10% 10%
4. Internal walls and plaster work 10% 10%
5. Fixing of chowkhats 10% 10%
6. Internal electrical work upto conducting 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10%
8. Internal Fire fighting work 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10%
10. Internal finishing like putty or paints etc. 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10%
12. External finishing like putty or paints etc. 10% 10%
13. External doors and windows including hardware. 10% 10%
14. Wiring and switches. 10% 10%
15. Internal doors and windows including hardware. 10% 10%
16. False ceiling work. 10% 10%
17. Polishing or painting work. 10% 10%
18. Cabling work in the towers. 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10%
20. Taps, wash basin, seat etc. 10% 10%
21. Finishing of stilt floor or basement. 10% 10%
22. Installation of lifts. 10% 10%
23. Electrical panels. 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
p q
1. Podium for parking. 10% 10%
2. External public health work. 10% 10%
3. External electrical work upto cabling work. 10% 10%
4. External fire fighting work. 10% 10%
5. Rain harvesting wells. 10% 10%
6. Sewerage Treatment plant. 10% 10%
7. Land scaping, tree planting etc. 10% 10%
8. External roads. 10% 10%
9. Treatment of wet garbage. 10% 10%
10. External electrical work including substation. 10% 10%
11. Bore well for water supply. 10% 10%
12. Under ground water tank (UGWT). 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10%
14. Fire protection and fire safety. 10% 10%
15. Club house. 10% 10%
16. Facilities and amenities other than in the club house. 10% 10%
17. Street lightning and other light work. 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
r s t
1. Excavation 10% 10% 10%
2. Foundations or basement 10% 10% 10%
3. Completion of all slabs 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10%
14. Wiring and switches. 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10%
16. False ceiling work. 10% 10% 10%
17. Polishing or painting work. 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10%
22. Installation of lifts. 10% 10% 10%
23. Electrical panels. 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
r s t
1. Podium for parking. 10% 10% 10%
2. External public health work. 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10%
4. External fire fighting work. 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10%
8. External roads. 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10%
10. External electrical work including substation. 10% 10% 10%
11. Bore well for water supply. 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10%
15. Club house. 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10%
  • 3 BHK - 1550 sq.ft
  • 3+1 BHK - 2250 sq.ft
  • 2 BHK - 1305 sq.ft
  • 3 BHK - 2050 sq.ft

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
i j k
1. Excavation 10% 10% 10%
2. Foundations or basement 10% 10% 10%
3. Completion of all slabs 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10%
14. Wiring and switches. 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10%
16. False ceiling work. 10% 10% 10%
17. Polishing or painting work. 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10%
22. Installation of lifts. 10% 10% 10%
23. Electrical panels. 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
i j k
1. Podium for parking. 10% 10% 10%
2. External public health work. 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10%
4. External fire fighting work. 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10%
8. External roads. 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10%
10. External electrical work including substation. 10% 10% 10%
11. Bore well for water supply. 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10%
15. Club house. 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
l m n o
1. Excavation 10% 10% 10% 10%
2. Foundations or basement 10% 10% 10% 10%
3. Completion of all slabs 10% 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10% 10%
14. Wiring and switches. 10% 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10% 10%
16. False ceiling work. 10% 10% 10% 10%
17. Polishing or painting work. 10% 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10% 10%
22. Installation of lifts. 10% 10% 10% 10%
23. Electrical panels. 10% 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
l m n o
1. Podium for parking. 10% 10% 10% 10%
2. External public health work. 10% 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10% 10%
4. External fire fighting work. 10% 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10% 10%
8. External roads. 10% 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10% 10%
10. External electrical work including substation. 10% 10% 10% 10%
11. Bore well for water supply. 10% 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10% 10%
15. Club house. 10% 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
p q
1. Excavation 10% 10%
2. Foundations or basement 10% 10%
3. Completion of all slabs 10% 10%
4. Internal walls and plaster work 10% 10%
5. Fixing of chowkhats 10% 10%
6. Internal electrical work upto conducting 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10%
8. Internal Fire fighting work 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10%
10. Internal finishing like putty or paints etc. 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10%
12. External finishing like putty or paints etc. 10% 10%
13. External doors and windows including hardware. 10% 10%
14. Wiring and switches. 10% 10%
15. Internal doors and windows including hardware. 10% 10%
16. False ceiling work. 10% 10%
17. Polishing or painting work. 10% 10%
18. Cabling work in the towers. 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10%
20. Taps, wash basin, seat etc. 10% 10%
21. Finishing of stilt floor or basement. 10% 10%
22. Installation of lifts. 10% 10%
23. Electrical panels. 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
p q
1. Podium for parking. 10% 10%
2. External public health work. 10% 10%
3. External electrical work upto cabling work. 10% 10%
4. External fire fighting work. 10% 10%
5. Rain harvesting wells. 10% 10%
6. Sewerage Treatment plant. 10% 10%
7. Land scaping, tree planting etc. 10% 10%
8. External roads. 10% 10%
9. Treatment of wet garbage. 10% 10%
10. External electrical work including substation. 10% 10%
11. Bore well for water supply. 10% 10%
12. Under ground water tank (UGWT). 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10%
14. Fire protection and fire safety. 10% 10%
15. Club house. 10% 10%
16. Facilities and amenities other than in the club house. 10% 10%
17. Street lightning and other light work. 10% 10%

Internal Infrastructure and Facilities Details

Sr.no Internal infrastructure and facilities work in the tower Percentage of work done (%)
r s t
1. Excavation 10% 10% 10%
2. Foundations or basement 10% 10% 10%
3. Completion of all slabs 10% 10% 10%
4. Internal walls and plaster work 10% 10% 10%
5. Fixing of chowkhats 10% 10% 10%
6. Internal electrical work upto conducting 10% 10% 10%
7. Internal public health upto all kind of installation of CPVC, SWR, Rain water pipes etc. 10% 10% 10%
8. Internal Fire fighting work 10% 10% 10%
9. Completion of flooring like tiles/stones/granite etc. in the flats as well in the common areas like staircase and common corridors 10% 10% 10%
10. Internal finishing like putty or paints etc. 10% 10% 10%
11. Mumty/machine room including overhead tanks. 10% 10% 10%
12. External finishing like putty or paints etc. 10% 10% 10%
13. External doors and windows including hardware. 10% 10% 10%
14. Wiring and switches. 10% 10% 10%
15. Internal doors and windows including hardware. 10% 10% 10%
16. False ceiling work. 10% 10% 10%
17. Polishing or painting work. 10% 10% 10%
18. Cabling work in the towers. 10% 10% 10%
19. Modular kitchen and bedroom wardrobes. 10% 10% 10%
20. Taps, wash basin, seat etc. 10% 10% 10%
21. Finishing of stilt floor or basement. 10% 10% 10%
22. Installation of lifts. 10% 10% 10%
23. Electrical panels. 10% 10% 10%
24. Lights for common corridors, staircase, stilt floor, basement etc. 10% 10% 10%

External Infrastructure and Facilities Details

Sr.no External infrastructure and facilities work in the complex excluding towers Percentage of work done (%)
r s t
1. Podium for parking. 10% 10% 10%
2. External public health work. 10% 10% 10%
3. External electrical work upto cabling work. 10% 10% 10%
4. External fire fighting work. 10% 10% 10%
5. Rain harvesting wells. 10% 10% 10%
6. Sewerage Treatment plant. 10% 10% 10%
7. Land scaping, tree planting etc. 10% 10% 10%
8. External roads. 10% 10% 10%
9. Treatment of wet garbage. 10% 10% 10%
10. External electrical work including substation. 10% 10% 10%
11. Bore well for water supply. 10% 10% 10%
12. Under ground water tank (UGWT). 10% 10% 10%
13. Pump room for UGWT and fire fighting. 10% 10% 10%
14. Fire protection and fire safety. 10% 10% 10%
15. Club house. 10% 10% 10%
16. Facilities and amenities other than in the club house. 10% 10% 10%
17. Street lightning and other light work. 10% 10% 10%